Skip to Content

It is the responsibility of all employers to ensure that relevant Operational Advice Notices (OANs) are brought to the attention of their staff. However, individuals remain responsible for their own actions and those who are in any doubt should consult their supervisor or manager.

This page contains all current OANs, downloadable in PDF format. The subject matter of the OANs has been reviewed and those no longer of relevance, or which are considered to be sufficiently promulgated, have been deleted without replacement.

Operational Advice Notices (OANs)

Title Document Date Version
ASWorks_OAN_460 Airside Road Tunnel Closure 11 December 2025 V1.0
ASWorks_OAN_459 Terminal 1 Demolition – Shuttle Road Closure 8 December 2025 V1.0
ASWorks_OAN_432 Pier 5 Road West Partial Closure and Traffic Diversion 2 December 2025 V1.0
ASDRVE_OAN_458 Introduction of Clean Vehicle Policy 28 November 2025 V1.0
ASDRVE_OAN_457 Cargo Tunnel Reopening Update 28 November 2025 V1.0
ASWorks_OAN_456 CP10A Night Closure 28 November 2025 V1.0
ASWorks_OAN_455  Control Post 14 Permanent Closure 27 November 2025 V1.0
ASWorks_OAN_454 Planned Maintenance Power Outage (December 2025) 26 November 2025 V1.0
ASWorks_OAN_435 Cargo Tunnel Closure 24 November 2025 V4.0
ASWorks_OAN_451 Building 1253 and Jelly Fish Demolition Works Phase 1 14 November 2025 V1.0
ASWorks_OAN_447 Fourth Avenue Partial Road Closure 3 November 2025 V1.0
ASWorks_OAN_446 Terminal 2 – NEW Arrivals Call Forward Point ‘GO LIVE’ 27 October 2025 V2.0
ASWorks_OAN_436 Cargo – Pollutant Waste Bin (POL Bin) Consolidation 22 September 2025 V1.0
ASWorks_OAN_400 Control Post 12 Nightly Closure 15 September 2025 V6.0
ASWorks_OAN_385 Control Post 12 Vehicle Lane Closure and Temporary Search Booth 27 August 2025 V2.0
ASWorks_OAN_418 Control Post 18 Closure 22 August 2025 V2.0
ASWorks_OAN_421 Terminal 3 – Pollutant Waste Bin (POL Bin) Consolidation 15 August 2025 V1.0
ASWorks_OAN_419 Terminal 4 – Pollutant Waste Bin (POL Bin) Consolidation 12 August 2025 V1.0
ASWorks_OAN_416 Loose Cladding Courier Road Pier 4A 8 August 2025 V1.0
ASWorks_OAN_408 Terminal 5 Road Width Restriction - Terminal Road East 14 July 2025 V1.0
ASWorks_OAN_406 Control Post 19 Entry and Exit Lanes - New Layout 9 July 2025 V1.0
ASWorks_OAN_272 Terminal 5 Ramp Information Display System 20 June 2025 V3.1
ASWorks_OAN_397 Terminal 2 Baggage Recovery Facility Phase 6 17 June 2025 V2.0
ASWorks_OAN_390 Permanent Closure of Control Post 25A Entrance Lanes  22 May 2025 V2.0
ASGrOps_OAN_391 Requirements for Introducing New Electric Vehicles and Ground Support Equipment  21 May 2025 V1.0
ASGrOps_OAN_381 Pre-Conditioned Air Operating Principles for Summer 2025 30 April 2025 V1.0
ASWorks_OAN_070 Cargo Tunnel Refurbishment Works and Contingency Route 2 April 2025 V9.0
ASGrOps_OAN_371 Turnaround Management Cameras 20 March 2025 V2.0
ASWorks_OAN_264 Terminal 2 – Pollutant Waste Bin (POL Bin) Consolidation 17 February 2025 V3.0
ASWorks_OAN_347 Control Post 12A Users 22 November 2024 V2.0
ASWorks_OAN_329 Terminal 5 – Pollutant Waste Bin (POL Bin) Consolidation 11 October 2024 V1.0
ASGrOps_OAN_249 Restricted Use of Taxiway Uncontrolled Crossings 12 August 2024 V4.0
ASGrOps_OAN_285 Personal Protective Equipment (PPE) 17 June 2024 V1.0
ASWorks_OAN_265 T2 Baggage Recovery Facility – Walking Route Changes 26 April 2024 V1.0
ASGrOps_OAN_143 United Airlines Aircraft Hangar- Stands 703/704 26 May 2023 V1.0
ASGrOps_OAN_046 Handling of Ad hoc Charter Flights - Appendix A - Form 2 June 2020  
ASGrOps_OAN_046 Handling of Ad hoc Charter Flights 2 June 2020